Our groundworks team attended an industrial site in order to repair a collapsed manhole.
Removed all rubble and cut out for new manhole frame
Installed and concreted new heavy duty man hole frame in place with new cover
RECENT JOBS
Commercial Plumbing
Reactive maintenance response to blocked sinks in ladies bathroom.
Shower Glazing
Replacement of shower glazing in commercial building as part of reactive maintenance response for the client facilities manger.
Repair of post and bar fence
Repair of post and bar fence
Surface drainage
As part of a planned preventative maintenance programme groundworks were carried out to replace broken drainage channel.
Removal of trip hazards
Laying of concrete paving to remove a trip hazard.
Emergency repair of bollard
Reactive maintenance - to reinstall a parking bollard at an industrial site. Removed old bollard cemented in new one and left the site tidy.