Our electrical and groundworks teams attended an industrial site in order to remove a damaged post that had been hit by an HGV. They first had to remove the CCTV and electrical that were attached to the post – remove the old post – replace with newly fabricated post.
RECENT JOBS
Earth Works
Is your site secure from unwanted visitors? The construction of a trench to prevent unauthorised caravans/vehicles from entering.
Ensuring Christmas Happens
Visited site to ensure that all Christmas light sockets were operational!
Installation of Gate
Fabrication and installation of new double leaf gate.
Pre-Christmas Refresh
Painting of bike racks and handrails ready for Christmas shopping at retail centre
Sign Clean
Cleaning of sign at entrance to industrial park.
Winter Preparations
In preparation for winter - drains cleared and over hanging trees branches cut back to prevent leaves falling into drains.