Our maintenance team were asked to urgently attend a commercial building where the lock had been tampered with, creating a security issue. The team attended found the specification of the new bolt that was required, return and retired making the building secure.
RECENT JOBS
Gutter Clearance
It is obviously important that gutters are kept clear in autumn to prevent water ingress.
Fire Strips
Installation of intumescent strips on fire doors post a Fire Risk assessment.
Refresh of external entrance areas
Pressure washing and sealing of cracks can give external areas an aesthetic uplift.
Rubbish Removal
It is important that fly tipping or other on site eye sores are removed as quickly as possible.
Commercial Building Refrubishment
Complete external refurbishment of 4 story commercial building.