Our reactive maintenance team for repair works carried out to palisade gates to the front of unit of 4 adjusting gates to allow locking eyes to line up. Straightening dropper bold and re-aligning fencing to allow clear access for gate to slide and lubricating wheels to allow free movement.
RECENT JOBS
Perimeter Fence
Installation of perimeter fencing
Installation of Bollards
Installation of Bollards.
Lighting Ornamental Stone
Lighting the ornamental stone bearing a shopping centre name.
External Steps
Repair of step to remove trip hazard.
Steel Edge Protection
Installation of plant, edge and isolation switch protection and gates.