Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs

RECENT JOBS

Glazing

Our glazing team attended a business centre in order to replace a large pane of commercial glass that had been damaged

2020-09-29T11:05:12+02:00
Go to Top