Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Clearing blocked gutters and downpipes
Our reactive maintenance team attended a commercial site where the bike store was suffering water ingress from a flooded roof due to the gutters and downpipes being blocked.
Sealing of flat roof above lift shaft
Our planned maintenance team attended a commercial building in order to service and seal a flat roof above a 10 story lift shaft to ensure that there would be no water ingress in to the lift shaft and thus preventing any future issues with the lift and its mechanical parts
Installation of access hatches
Our planned maintenance team attended a site in Canary Wharf and installed 4 * access hatched into the rear of kitchen cupboards to facilitate easy access to utilities
New post and sign
Our planned maintenance team attended an industrial site and installed a new standing post and 15mph speed sign as a health and safety measure.
Replacement of damaged safety barrier
Our planned maintenance team team attended an industrial site in order to repair a damaged safety barrier which was a potential health and safety risk.
Freddy the falcon
Seagulls were creating a health and safety issue at an industrial site.