Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Fire escape route clearance
Attended site in order to sweep both fire escapes on both sides of the building to clear all litter and leaves
Line Marking
Our team attended an office park in order to apply thermostatic road markings
Electrical inspection and repair of external lighting
Our electrical team attended an industrial park in order to inspect and repair as necessary the external lighting.
Leak repair
Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
Vanity unit refurbishment
Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage.
Electrical Installation
Our electrical team attended a central London commercial building for an installation.