Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Light repair in car park
Our electrical team attended site and isolated electrical supply to light fittings.
EICR wiring certificate
Our electrical team attended site in order to test and provide an EICR on 3 36 way 3 phase distribution boards.
Palisade fence repairs at industrial site
Our reactive maintenance team for repair works carried out to palisade gates to the front of unit of 4 adjusting gates to allow locking eyes to line up.
Decoration of residential flat
Our decorating team attended site in order to redecorate all walls of a residential flat following a change of tenancy.
‘One stop shop’ – Health and safety – roofing – electrics – decorating
Our multi skilled team attended a commercial premises in order to fulfil a number of ‘handyman’ jobs in one visit highlighted in a health and safety assessment and tenant.
Fire escape route clearance
Attended site in order to sweep both fire escapes on both sides of the building to clear all litter and leaves