Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs

RECENT JOBS

Step nosing

Our planned maintenance team attended a commercial site in order to highlight a potential hazard identified by a health and safety report.

2020-09-29T11:05:12+02:00
Go to Top