Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Temporary bike parking capacity.
Our reactive team attended a commercial building in order to increase the bike parking capacity in order to allow employees to avoid public transport and adding to traffic congestion during the corona.
Fire exit refurbishment
Our planned maintenance team attended a sports complex as the areas around the fire exits needed decorating and refurbishing.
Increased bike rack capacity
Our reactive team installed temporal bike parking in the carpark of a commercial building so that employees could avoid public transport during the corona
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.