Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Damaged wall due to plant growth
Our reactive maintenance team attended a commercial premises where there was plant growth damaging a rear wall.
Refurbishment
Planned maintenance of stairwell of commercial building.
Clearance of fire escape
In response to a Fire Risk Assessment our reactive maintenance team attended an industrial site.
Hand sanitiser installation
Our preventative maintenance team installed hand sanitiser and signage throughout a commercial premises to ensure that health and safety guidance relating to the corona was followed and the premises were COVID-19 SECURE .
Corona signage and sanitiser stations
Our preventative maintenance team attended a commercial premises in order to install signage and hand sanitiser stations to ensure that the premises with the health and safety guidance as regards the corona.
Corona signage
Our preventive maintenance team attended a commercial premises in order to install signage to ensure that the site complied with health and safety guidance to prevent the corona.