Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs

RECENT JOBS

Brickwork Repair

Following the identification of a pillar in disrepair our reactive maintenance team attended site. They toothed out all broken brick work in the pillar and re-layed new bricks to rebuild the pillar.

FRA Response

Our maintenance team attended a central London office to deal with recommendations post a Fire Risk Assessment. One of which was to relocate the fire extinguishers.

2020-09-29T11:05:12+02:00
Go to Top