Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Health and Safety Survey Response
Planned maintenance in response to a health and safety survey.
Groundworks and road lining
Planned maintenance at industrial park including groundworks, line marking and signage.
Decorating
Planned maintenance to decorate the lobby area of an office due to wear and tear.
Maintenance of conservatory roof glazing
Planned maintenance of conservatory roof glazing at an office
Refurbishment of office lavatories
Planned maintenance - Refurbishment of toilets in office due to rising damp.