Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Installation of fabricated gate and fence
Fabrication of gates and fencing at industrial complex to enhance security as part of planned preventive maintenance programme.
Installation of LED floodlights
Electrical Installation of 6 LED floodlights at office complex as part of planned preventative maintenance programme.
Servicing and repair of entrance doors
Reactive servicing and repair of entrance doors to office to ensure security maintained.
Installation of speed bumps
Installation of speed bumps in office carpark as part of planned preventative maintenance following health and safety review
Cleaning and repair of shop front
Cleaning and repair of shop front of retail unit as part of reactive maintenance response.
Brickworks
Repair and Replacement of Brickworks