Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Installation of motion sensor and external light
Installation of external light and motion sensor for commercial building.
Refurbishment of disabled toilet.
Refurbishment of disabled toilet.
Emergency Repair of Bollard
Emergency repair of bollard hit by a vehicle.
Tiling of Bathroom
Tiling of Bathroom
Rubbish Removal
Safe removal of rubbish.
Installation of Microwave Sensors
Installation of microwave sensors on stairs.