Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Refurbishment of disabled toilet.
Refurbishment of disabled toilet.
Emergency Repair of Bollard
Emergency repair of bollard hit by a vehicle.
Tiling of Bathroom
Tiling of Bathroom
Rubbish Removal
Safe removal of rubbish.
Installation of Microwave Sensors
Installation of microwave sensors on stairs.
Hazard Strips
Installation of hazard strips to ensure that health and safety issues don’t occur in plant room.









