Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Traffic Control
Installation of traffic control signs at commercial site.
Stainless Steel Bollards
Fitting of bollards to protect pedestrian access to Marks and Spencer at retail center.
New Concrete Level
Repair of pavement after Health and Safety review to ensure no trip hazards.
Quarterly Refurbishment – Retail Park
Quarterly visit including electrics - signs and trip hazards.
Securing of Site with Concrete Blocks
Unwanted visitors can result in significant damage and legal fees - we are experienced at securing sites using concrete and digging trenches and building up earth mounds.









