Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Ensuring Christmas Happens
Visited site to ensure that all Christmas light sockets were operational!
Installation of Gate
Fabrication and installation of new double leaf gate.
Pre-Christmas Refresh
Painting of bike racks and handrails ready for Christmas shopping at retail centre
Sign Clean
Cleaning of sign at entrance to industrial park.
Winter Preparations
In preparation for winter - drains cleared and over hanging trees branches cut back to prevent leaves falling into drains.
Emergency Repair
Emergency 2 hour repair to damaged height restrictor at Oxford retail park.