Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Glass Pane
Emergency replacement of cracked pane of glass at commercial building.
Speed Limit Sign
Installation of speed limit sign to ensure safe traffic flows at industrial site.
Concrete Trip Hazards
Concreting of trip hazards - The swift identification and rectifying of any trip hazards can prevent any injury or claims occurring
Highlighting of Steps
Highlighting of steps in order to prevent trip hazards and potential accidents.
Securing of Bike Shed
Fitting slats to open section of a bike store and new lock : Preventative measures to prevent fly tipping and secure open areas can save clearance costs.