Two man groundworks team attended a central London commercial location.Lifted slabs that were causing a trip hazard and set aside while base was cleaned out. Relayed slabs with sharp sand so that level with existing slabs.Raked out all loose mortar joints in slabs.Re-pointed all mortar joints in the slabs
RECENT JOBS
Paving Clean
Cleaning of external paving - we ensured that the external areas of the building reflected the quality of the interior.
Emergency Boarding Up
Boarding up of vacant retail outlet - The unauthorised access of vacant retail outlets can result in damage and insurance premium increases.
Repair of Bathroom Surface
Bathrooms are often the first impression visitors and potential tenants have of a building. We repaired surfaces to ensure reflected the quality of the building.
Smoking Bins
We attached smoking bins to prevent smokers gathering outside the entrance of a commercial building...
LED Lighting
Installation of LED lighting for MEES on industrial estate.
Perimeter Fence
Installation of perimeter fencing