Our refurbishment team team attended a commercial premises to take advantage of the areas being quiet during the corona lock down period. They repainted, repaired the surfaces and repainted the under croft and tunnel areas.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2020-06-26T16:43:01+02:00
Go to Top