Our team attended a commercial office building removed all signs
Rubbed down walls/ceilings to remove dirt and flaking paint
Painted walls white where currently white with sandtext and then grey paint covered in apple green
Painted ceiling in white paint emulsion
Supplied and fit check plates to the bin store doors external side only
RECENT JOBS
Commercial Plumbing
Reactive maintenance response to blocked sinks in ladies bathroom.
Shower Glazing
Replacement of shower glazing in commercial building as part of reactive maintenance response for the client facilities manger.
Repair of post and bar fence
Repair of post and bar fence
Surface drainage
As part of a planned preventative maintenance programme groundworks were carried out to replace broken drainage channel.
Removal of trip hazards
Laying of concrete paving to remove a trip hazard.
Emergency repair of bollard
Reactive maintenance - to reinstall a parking bollard at an industrial site. Removed old bollard cemented in new one and left the site tidy.