Our refurbishment team attended a retail premises that was closed due to the corona. They removed cladding and cleared all loose plaster from the wall. Battened wall and installed new 100mm T&G cladding. Installed length of torus skirting board and caulked perimeters leaving bare wood for client to paint.
RECENT JOBS
Groundworks bollard installation
Our groundworks team attended a retail park.
Commercial plumbing
Plumber attended a retail site in Derby
Decorating
Our decorating team attended a central London commercial office.
Installation of hand rails in dry riser
Our planned maintenance team attended a commercial building following a FRA in order to: install 3 hand rails from galvanised steel poles fixed into brackets fixed to the wall either side of the riser.
Commercial roof repair
Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Decorating
Our decorating team redecorated an internal lobby that had been badly affected by water ingress.