Our refurbishment team attended a retail premises that was closed due to the corona. They removed cladding and cleared all loose plaster from the wall. Battened wall and installed new 100mm T&G cladding. Installed length of torus skirting board and caulked perimeters leaving bare wood for client to paint.
RECENT JOBS
Fire door replacement
Our reactive maintenance team attended a West End office building in order to replace a fire door.
Block paving repair
Our groundworks team attended an office centre after a number of heavy goods vehicles had damaged the block paving.
Repair of brickwork
Our reactive maintenance team attended a business centre in order to repair a damaged wall.
Replacement glass unit to office conservatory
Our planned maintenance team attended a commercial office in order to replace the damaged glazing on an internal conservatory.
Access door repair
Floor spring and bottom shoe replacement of door
Re-lay of slabs
Two man groundworks team attended a central London commercial location.