Our refurbishment team attended a retail premises that was closed due to the corona. They removed cladding and cleared all loose plaster from the wall. Battened wall and installed new 100mm T&G cladding. Installed length of torus skirting board and caulked perimeters leaving bare wood for client to paint.
RECENT JOBS
Plumbing Installation
Our plumbing team attended a commercial building in order to adapt existing pipework, install a cold water feed tape and adapt the waste removal pipe in order to allow the installation of a a dishwasher.
Roof Edge Protection
Our preventive maintenance team attended a commercial building as a health and safety report had indicated that the roof edging should be increased in height. Using safety harnesses the team dismantled the existing structure and resembled to meet the height requirement.
Car Park Barriers
Our planned maintenance team attended a retail park in response to a health and safety survey which had indicated that vehicle barriers appeared to be damaged and in disrepair. Our team dug out and replaced two barriers, reset three others and painted all including cutting back hedges that obscured.
Wooden Flooring Repair
Our carpentry team attended in order to repair wooden flooring at the request of tenant. It was found that runs were loosely fitted and so were refitted to satisfaction of tenant.
Replacement of internal doors
Our decorating team replaced doors leading onto stair case from second floor lobby and painted with 1 coat of undercoat and 2 top coats gloss
Road Marking
Our line marking team visited a retail park to remark centre lines, double yellow lines and a pedestrian crossing.