Our refurbishment team attended a retail premises that was closed due to the corona. They removed cladding and cleared all loose plaster from the wall. Battened wall and installed new 100mm T&G cladding. Installed length of torus skirting board and caulked perimeters leaving bare wood for client to paint.
RECENT JOBS
Removal of electric entrance barrier
Our reactive team were called to a retail park in order to remove an electric entrance barrier.
Main access door repair
Our team attended as a matter of urgency a commercial building where the main access doors had developed a problem.
Decorating
After a number of leaks our decorating team attended a commercial building to redecorate the staircases and landings. Initially stain block was applied followed by two coats of matt emulsion.
Floor replacement
Our flooring team attended a hospital and replaced corridor flooring. This was done over two weekends so as not to disrupt patients.
Glazing repair
Attended a commercial unit and reglazed a shaped toughened tinted glass double glazed sealed unit with manifestation to match existing
Construction of smoking shelter and associated groundworks
Supplied, delivered and assembled an open fronted smoking shelter