Our refurbishment team attended a retail premises that was closed due to the corona. They removed cladding and cleared all loose plaster from the wall. Battened wall and installed new 100mm T&G cladding. Installed length of torus skirting board and caulked perimeters leaving bare wood for client to paint.
RECENT JOBS
Relaying of Roof to Prevent Water Ingress
Sometimes the original design of a roof can be altered at little cost compared to a new roof to mitigate water ingress.
Temporary Liquid Resin Treatment
The application of liquid resin to areas suffering water ingress can be an efficient and cost effective approach pending more substantial investment.
Relay of Carpet
Loose carpet can be a trip hazard and is easily corrected.
Installation of Bollards
Installing bollards to prevent damage to walls can reduce longer term costs.
Replacement Door Handle
Emergency replacement of door handle.