Following a health and safety review that identified a number of slip hazards our groundworks team attended and relaid the block paving round a manhole cover

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2019-11-05T13:39:57+02:00
Go to Top