Following a health and safety review that identified a number of slip hazards our groundworks team attended and relaid the block paving round a manhole cover
RECENT JOBS
Refurbishment of office lavatories
Planned maintenance - Refurbishment of toilets in office due to rising damp.
Commercial Plumbing
Reactive maintenance response to blocked sinks in ladies bathroom.
Shower Glazing
Replacement of shower glazing in commercial building as part of reactive maintenance response for the client facilities manger.
Repair of post and bar fence
Repair of post and bar fence
Surface drainage
As part of a planned preventative maintenance programme groundworks were carried out to replace broken drainage channel.
Removal of trip hazards
Laying of concrete paving to remove a trip hazard.