Our ground works team attended a retail site in order to carry out the following:
Dig out snapped concrete fence post
Remove damaged chain link fencing
Dig out 2 damaged Armco barrier posts
Lift Armco barriers off and set aside
Install new 1.8m concrete chain link fence post
Install new sections of plastic coated galvanised chain link fencing and tension wires
Install 2nd new Armco barrier posts to be concreted in
Re-fit existing Armco barrier sections to new posts
RECENT JOBS
Plumbing Installation
Our plumbing team attended a commercial building in order to adapt existing pipework, install a cold water feed tape and adapt the waste removal pipe in order to allow the installation of a a dishwasher.
Roof Edge Protection
Our preventive maintenance team attended a commercial building as a health and safety report had indicated that the roof edging should be increased in height. Using safety harnesses the team dismantled the existing structure and resembled to meet the height requirement.
Car Park Barriers
Our planned maintenance team attended a retail park in response to a health and safety survey which had indicated that vehicle barriers appeared to be damaged and in disrepair. Our team dug out and replaced two barriers, reset three others and painted all including cutting back hedges that obscured.
Wooden Flooring Repair
Our carpentry team attended in order to repair wooden flooring at the request of tenant. It was found that runs were loosely fitted and so were refitted to satisfaction of tenant.
Replacement of internal doors
Our decorating team replaced doors leading onto stair case from second floor lobby and painted with 1 coat of undercoat and 2 top coats gloss
Road Marking
Our line marking team visited a retail park to remark centre lines, double yellow lines and a pedestrian crossing.