Our ground works team attended a retail site in order to carry out the following:
Dig out snapped concrete fence post
Remove damaged chain link fencing
Dig out 2 damaged Armco barrier posts
Lift Armco barriers off and set aside
Install new 1.8m concrete chain link fence post
Install new sections of plastic coated galvanised chain link fencing and tension wires
Install 2nd new Armco barrier posts to be concreted in
Re-fit existing Armco barrier sections to new posts
RECENT JOBS
Collapsed Manhole Cover
Our groundworks team attended an industrial park in order to repair frame and cover of collapsed manhole highlighted by a health and safety review. .
Wall construction and handrail replacement
Our groundworks team visited an industrial park in order to reconstruct a damaged wall and replace and reattach a handrail.
Health and Safety Job
Following a health and safety survey our preventative maintenance team were asked to highlight potential hazards at a commercial building to reduce the risk of accidents.
Decoration
Out of hours planned maintenance of stud wall construction and paining to improve the layout of office in a commercial building.
Wall Construction
Reactive maintenance - our groundworks team attended a business park to reconstruct a wall that had been damaged by a vehicle, reusing existing brickworks where possible.