Our ground works team attended a retail site in order to carry out the following:
Dig out snapped concrete fence post
Remove damaged chain link fencing
Dig out 2 damaged Armco barrier posts
Lift Armco barriers off and set aside
Install new 1.8m concrete chain link fence post
Install new sections of plastic coated galvanised chain link fencing and tension wires
Install 2nd new Armco barrier posts to be concreted in
Re-fit existing Armco barrier sections to new posts
RECENT JOBS
Removal of electric entrance barrier
Our reactive team were called to a retail park in order to remove an electric entrance barrier.
Main access door repair
Our team attended as a matter of urgency a commercial building where the main access doors had developed a problem.
Decorating
After a number of leaks our decorating team attended a commercial building to redecorate the staircases and landings. Initially stain block was applied followed by two coats of matt emulsion.
Floor replacement
Our flooring team attended a hospital and replaced corridor flooring. This was done over two weekends so as not to disrupt patients.
Glazing repair
Attended a commercial unit and reglazed a shaped toughened tinted glass double glazed sealed unit with manifestation to match existing
Construction of smoking shelter and associated groundworks
Supplied, delivered and assembled an open fronted smoking shelter