Our ground works team attended a retail site in order to carry out the following:
Dig out snapped concrete fence post
Remove damaged chain link fencing
Dig out 2 damaged Armco barrier posts
Lift Armco barriers off and set aside
Install new 1.8m concrete chain link fence post
Install new sections of plastic coated galvanised chain link fencing and tension wires
Install 2nd new Armco barrier posts to be concreted in
Re-fit existing Armco barrier sections to new posts
RECENT JOBS
Outer Buildings Gutter Clean
Cleaning of gutters to prevent water ingress using spider boom and self propelled boom.
Preparation for New Tennants
Workman attended to ensure that all signage left by previous tenant was removed in preparation for new tenants’ arrival.
Locksmith / Window Locks
A locksmith attended to ensure that window locks operated effectively and hence were effective in securing the building.
Installation of Fire Doors
Installation of fire doors - SPA have a number of years experience of responding to Fire risk assessments and Health and Safety surveys.








