Our reactive maintenance team attended a business centre in order to repair a damaged wall. They removed damaged bricks from the wall.Cleaned off mortar on bricks for reuse.Cleaned mortar off wall to allow new bricks to be laid.Laid new header bricks.Raked out silicone in expansion gap and re-siliconed.
RECENT JOBS
Groundworks
Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.
Electrical
Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.
Installation of Lightweight Steel Frame external walling residential block
Installation of the SFS infill external walls before fitting the fire rated cladding and insulation.