2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
Gutter and downpipes clearance
Our guttering team attended a retail centre and insured that all downpipes were cleared and flushed
Totem Refurbishment
Our maintenance team attend a retail site - removed old vinyls and replaced with new tenant vinyls on 3 totems - cleaned and removed graffiti
Security Signage
Our maintenance team attended a business park and installed security signage (CCTV in operation and private property) in order to ensure that 3rd parties were made aware upon visiting
Bollard Installation
Our groundworks team visited an industrial site in order to replace a bollard that had been damaged by an HGV.
Sign Refurbishment
Our reactive team attended an industrial site in order to refurbish a sign that had been the victim of a poor graffiti artist
Installation of bollards at retail site
Our groundworks team attended a retail site in West London.