2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
Line Marking
Line marking team attended site to a London based office block to reline the car park and add additional green parking bays.
Decorating
Decorating team attended office building.
Line Marking
Line marking team attended office car park. Supplied and applied thermoplastic on tarmac.
Groundworks
Groundworks team attended site and repaired broken kerbs and pavement slabs.
Groundworks – Health & Safety
Groundworks team attended retail park. Cut out tarmac ready for new tarmac to be laid. Re-laid tarmac to fill potholes.