2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
Installation of muster point post
Installation of muster point post
Replacement of leaking auto air vents
Our commercial plumbing team attended a medical centre where water leakage had been observed.
Health & Safety Repairs at Retail Park
Our reactive maintenance team visited a retail park where a number of minor Health and Safety issues had been raised.
Water Ingress
Our preventative maintenance team visited a commercial building in central London that had experienced a number of water ingress issues.
Road lining at retail park
Our planned maintenance team visited a retail park in order to repaint faded road markings.
Replacement concrete bollards
Our groundworks team attended a Midlands industrial estate in order to repair damaged concrete bollards.