2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
Temporary bike parking capacity.
Our reactive team attended a commercial building in order to increase the bike parking capacity in order to allow employees to avoid public transport and adding to traffic congestion during the corona.
Fire exit refurbishment
Our planned maintenance team attended a sports complex as the areas around the fire exits needed decorating and refurbishing.
Increased bike rack capacity
Our reactive team installed temporal bike parking in the carpark of a commercial building so that employees could avoid public transport during the corona
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.