2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
Groundworks
Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.
Electrical
Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.
Installation of Lightweight Steel Frame external walling residential block
Installation of the SFS infill external walls before fitting the fire rated cladding and insulation.