2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
Replacement of glass on 3 story building
Our working at heights planned maintenance team cut out glazing from 3rd floor.
Refurbishment of fence rail / sub station and block paving
Our planned maintenance team attended a retina site and renewed the wooden knee rail fence...
Groundworks business centre
Our groundworks team attended site - lifted areas of dropped and risen block paving that had created a trip hazard in the car park...
External decoration of retail complex
Our planned maintenance team were asked to refresh and decorate a normally busy thoroughfare in a retail complex
Jet Washing
Our cleaning team attended a commercial building where the stairs leading from the car park had become both unsightly and a potential hazard.
Office door repair
Our maintenance team were asked to urgently attend a commercial building where the lock had been tampered with, creating a security issue.