2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
Gutter clearance
Our planned maintenance team carried out the quarterly gutter clearance at a commercial premises.
Paving replacement
Our groundworks team attended an office building in response to a health and safety audit.
Installation of barrier and hoop barriers
Our groundworks team attended an industrial site in order to install and test road barrier
Bike shelter construction
Our groundworks team attended a commercial site to install 6m cantilever cycle shelter.
Refurbishment of external areas
Our planned maintenance team attended a commercial property to refurbish some of the outside areas.
Plumbing Installation
Our plumbing team attended a commercial building in order to adapt existing pipework, install a cold water feed tape and adapt the waste removal pipe in order to allow the installation of a a dishwasher.