2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
Gully Replacement
A planned groundworks job to replace broken and loose gully slabs.
Refurbishment of Fire Exit
A planned maintenance job in response to a fire risk assessment.
Tarmac Repair
Planned maintenance in response to a health and safety review.
Clearing of Moss and Algae
Planned maintenance in response to health and safety review.
Groundworks Retail Park
Planned maintenance including groundworks, signage and drains.
Health and Safety Survey Response
Planned maintenance in response to a health and safety survey.