2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
Replacement of Lighting in Car Park
Reactive maintenance to restore lighting in carpark in order ensure security and health and safety on compromised.
Thermoplastic road markings
Application of thermoplastic road markings
Roof Repairs
Reactive maintenance commercial roof repair involving the sealing of up stands and joints in roof felting due to a roof leak.
Resetting of granite setts
Resetting of granite setts and road resurfacing on roadway at office building complex as part of planned preventive maintenance.
Installation of steel bollards
Installation of steel bollards to separate pedestrians at retail centre.
Installation of fabricated gate and fence
Fabrication of gates and fencing at industrial complex to enhance security as part of planned preventive maintenance programme.