2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
Entrance Doors
Installation of entrance doors to ensure good first impressions of commercial office building.
Bollard Installation
Installation of bollard to protect pavement.
Height Restrictor
Repair of height restrictor.
Drone Survey
Drone survey of residential flat roof to check for source of water ingress.
Installation of steel mesh
Installation of steel mesh - Are your fire exits secure from unauthorised access?
Relaying of Roof to Prevent Water Ingress
Sometimes the original design of a roof can be altered at little cost compared to a new roof to mitigate water ingress.