2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
High Level Gutter Clearance with Spider Boom
Clearing high level gutters of a commercial office in order to prevent water ingress problems in the future using a C230 Spider Boom.
Fitting of solar reflective film
Fitting of solar reflective solar film to external windows of commercial building in order to reduce air conditioning requirements leading to substantial costs savings and increased building energy efficiency.
External Painting and Refurbishment of Commercial Offices
Large scale refurbishment of commercial offices in Kensington including - painting, window refurbishment and pointing.
Door Frame Repair
Quality carpentry and painting can make woodwork look just like new even after a break in.
Removal of bird waste from flat roof.
Removal of bird waste from flat roof.
Outer Buildings Gutter Clean
Cleaning of gutters to prevent water ingress using spider boom and self propelled boom.