2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
Emergency Boarding Up
Boarding up of vacant retail outlet - The unauthorised access of vacant retail outlets can result in damage and insurance premium increases.
Repair of Bathroom Surface
Bathrooms are often the first impression visitors and potential tenants have of a building. We repaired surfaces to ensure reflected the quality of the building.
Smoking Bins
We attached smoking bins to prevent smokers gathering outside the entrance of a commercial building...
LED Lighting
Installation of LED lighting for MEES on industrial estate.
Perimeter Fence
Installation of perimeter fencing