2 man team to attend site to carry out the following:
To lift out raised block paving in areas specified by Health and safety report in 3 areas
Set aside while roots are cut out and remove. Install sand to level base out
Relay blocks ensuring all level
Go over areas with wacker plate
Reset yellow bollard Dig out rodding eye
Supply and install new rodding eye Remove all waste from site
RECENT JOBS
Electrical Earthing Point
Uplift and relay of pavement in order to upgrade earthing rod to ensure compliant with regulations.
Lead Guttering Using Harnesses
Lifting and replacement of lead guttering following resin patch repairs using harnesses.
Gutter Repair
Repair of guttering preventing water ingress at residential flat.
Cleaning External
Cleaning and refreshing external parts of commercial building prior to being relet.
Boarding Up
Emergency call out to board up broken window on 3rd floor of office.
Loose Steps
Lifted and reattached front steps to commercial office to remove trip hazard.