Carry out an initial survey of the totem sign utilising a powered access machine to assess the existing framework and fixings. Advised on additional supports required internally to add strength.
Fabricated 2no back to back panels, powder coated to a standard RAL to replicate the existing signage with applied profile cut vinyl graphics. Overall size based upom 550mm wide x 3000mm high.
Returned to site fit new signage to existing framework and secure into position utilizing a powered access machine. Installed on site during normal working hours, utilising the protective barriers around the working area.
RECENT JOBS
Reconstruction of fence
Our reactive team attended in order to repair a defective fence.
Installation of new roof hatches
Installation of new roof hatches
Installation of muster point post
Installation of muster point post
Replacement of leaking auto air vents
Our commercial plumbing team attended a medical centre where water leakage had been observed.
Health & Safety Repairs at Retail Park
Our reactive maintenance team visited a retail park where a number of minor Health and Safety issues had been raised.
Water Ingress
Our preventative maintenance team visited a commercial building in central London that had experienced a number of water ingress issues.