Carry out an initial survey of the totem sign utilising a powered access machine to assess the existing framework and fixings. Advised on additional supports required internally to add strength.
Fabricated 2no back to back panels, powder coated to a standard RAL to replicate the existing signage with applied profile cut vinyl graphics. Overall size based upom 550mm wide x 3000mm high.
Returned to site fit new signage to existing framework and secure into position utilizing a powered access machine. Installed on site during normal working hours, utilising the protective barriers around the working area.
RECENT JOBS
Temporary bike parking capacity.
Our reactive team attended a commercial building in order to increase the bike parking capacity in order to allow employees to avoid public transport and adding to traffic congestion during the corona.
Fire exit refurbishment
Our planned maintenance team attended a sports complex as the areas around the fire exits needed decorating and refurbishing.
Increased bike rack capacity
Our reactive team installed temporal bike parking in the carpark of a commercial building so that employees could avoid public transport during the corona
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.