Carry out an initial survey of the totem sign utilising a powered access machine to assess the existing framework and fixings. Advised on additional supports required internally to add strength.
Fabricated 2no back to back panels, powder coated to a standard RAL to replicate the existing signage with applied profile cut vinyl graphics. Overall size based upom 550mm wide x 3000mm high.
Returned to site fit new signage to existing framework and secure into position utilizing a powered access machine. Installed on site during normal working hours, utilising the protective barriers around the working area.
RECENT JOBS
Refurbishment of external areas
Our planned maintenance team attended a commercial property to refurbish some of the outside areas.
Plumbing Installation
Our plumbing team attended a commercial building in order to adapt existing pipework, install a cold water feed tape and adapt the waste removal pipe in order to allow the installation of a a dishwasher.
Roof Edge Protection
Our preventive maintenance team attended a commercial building as a health and safety report had indicated that the roof edging should be increased in height. Using safety harnesses the team dismantled the existing structure and resembled to meet the height requirement.
Car Park Barriers
Our planned maintenance team attended a retail park in response to a health and safety survey which had indicated that vehicle barriers appeared to be damaged and in disrepair. Our team dug out and replaced two barriers, reset three others and painted all including cutting back hedges that obscured.
Wooden Flooring Repair
Our carpentry team attended in order to repair wooden flooring at the request of tenant. It was found that runs were loosely fitted and so were refitted to satisfaction of tenant.
Replacement of internal doors
Our decorating team replaced doors leading onto stair case from second floor lobby and painted with 1 coat of undercoat and 2 top coats gloss